Water Rates
Below are our current rates for water usage (Effective 6/1/09).
Mg-1-General Service Minimum Monthly Bill: (Based on Meter Size)
| 5/8" | Meter.....$6.75 | 2” | Meter.....$26.47 |
| 3/4” | Meter.....$6.75 | 3” | Meter.....$41.52 |
| 1” | Meter.....$10.90 | 4” | Meter.....$62.28 |
| 1 1/4” | Meter.....$13.75 | 6” | Meter.....$110.03 |
| 1 1/2” | Meter.....$16.61 | 8” | Meter.....$165.04 |
| 10” | Meter.....$230.44 |
Public fire protection service
FIRST 16,700 cu. Ft. $2.33 per 100 cu. Ft. NEXT 83,300 cu. Ft. $1.99 per 100 cu. Ft. OVER 100,000 cu. Ft. $1.65 per 100 cu. Ft.
The municipality has chosen to have the utility bill the retail general service customers for public fire protection (PFP). This rate is also applicable to vacant lots and properties which front utility-owned mains but are not general service customers of the water utility.Monthly Publick Fire Protection service charge:
$0.04793 per thousand dollars of assessed valuation.Sprinkler meters
The public fire protection billing allows for the collection of PFP charges from property owners who are not subject to property taxes.
If a customer requests the installation of an additional meter* to receive credit for clear water not discharged into the sanitary server system, the utility shall furnish and install this additional meter. This rate applies to single-family residential and small commercial customers. A rental fee shall be charged for the user of this meter and the following monthly rates shall apply:
| 5/8" | Meter.....$3.50 per billing period | 3/4” | Meter.....$3.50 per billing period |
| 1” | Meter.....$4.70 per billing period | 11/4” | Meter.....$6.00 per billing period |
| 11/2” | Meter.....$7.00 per billing period | 2” | Meter.....$12.00 per billing period |
The customer will pay for all piping in accordance with schedule X-1, water utility operation rules, installation of meters.
The minimum service contract shall be one year unless otherwise specified by special contract. Where the utility has
disconnected service at the customer’s request prior to expiration of the minimum contract period, a reconnection charge
shall be made payable in advance, when the customer requests reconnection of service. The minimum contract period is renewed
with each connection
*For this rate to apply, the additional meter must be installed on the same service lateral
as the primary meter
